In January 2024, all products of the low-voltage cabinet contract signed by our company with Indonesian PT. Kerinci Mergangin Hidro Company have been produced in accordance with relevant IEC standards and the customer company's drawing requirements.
After communicating with the customer company, our company conducted a three-day online FAT at the factory with factory personnel and customer company personnel from January 22 to 24, 2024, and inspected all 81 low-voltage cabinets in the contract.
During the entire FAT process, we strictly followed the requirements of the IEC low-voltage cabinet inspection standard IEC 61439-1, inspected each piece of equipment item by item, and passed the online inspection one by one. and finally successfully completed the inspection and obtained on-the-spot approval from the customer.