Outgoing Wire Bonding Method Of Dry-type Transformer

I. Bus clamp 2, long bolt 3, bolt group 4, side-outlet horizontal hard busbar 5, side-outlet vertical soft busbar 6. As shown in Figure I and Figure 2, the low-voltage side outlet installation structure of the dry-type dry-type transformer of the present invention includes a side outlet support frame I, a bus clamp 2, a long bolt 3, a bolt group 4, and a side outlet horizontal hard busbar 5. Side outlet vertical soft busbar 6. The side outlet support frame I is fixed to the upper clamp of the dry-type transformer by the bolt group 4, the side outlet horizontal hard busbar 5 is fixed in the busbar clamp 2, and the busbar clamp 2 is fixed on the side outlet support frame I by the long bolt 3. The outlet vertical flexible busbar 6 connects the side outlet horizontal hard busbar 5 and the outlet row on the main body of the dry-type transformer to form a side outlet as a whole. Since the side outlet vertical soft busbar 6 has a certain extension length, when the installation height H needs to be changed, the busbar clamp 2 moves up and down in the long bolt 3 to determine the height, and then is fixed by the bolt group 4, SP can achieve the purpose of adjusting the installation height. As shown in Figures 3 and 4, the side outlet support frame I of the present invention is fixed on the upper clamp of the dry-type transformer, the lower part is fixed with bolts, the upper part is installed with long bolts 3, and the bolt group 4 is used to fix the upper part. The bus clamp 2 passes through the long bolt 3, and the upper and lower parts are fixed and positioned by the bolt group 4. Within the length of the long bolt 3, by adjusting the position of the bolt group 4, the position of the bus clamp 2 can be adjusted up and down to reach the adjustment side. The purpose of the outlet horizontal hard busbar 5 height.

Send Inquiry